Engineers Clinic
IntermediateEngineering trackCA-CP-40

EV Charging Network Siting for a Province

Internship role: Energy Planning Intern. Site fast chargers along provincial corridors to minimise range gaps under grid capacity limits, and report coverage achieved per dollar.

10 Guided Steps240h Internship TierSubmit: GitHub repo or evidence pack + live demo / report + README + milestone logbookVerified CertificateAI Rubric Graded
Program Overview

Internship role: Energy Planning Intern. Site fast chargers along provincial corridors to minimise range gaps under grid capacity limits, and report coverage achieved per dollar.

What you submit

GitHub repo or evidence pack + live demo / report + README + milestone logbook

Stack: Python, traffic and grid data, GeoPandas, optimisation

How it is graded

Signals: Milestone gates met; measurable result reported; documentation; deployment or evidence reachable; reflective log

  • Functionality & requirements30
  • Technical quality & architecture25
  • Documentation15
  • Deployment & evidence15
  • Innovation10
  • Presentation5

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
240-hour Canada programme. NRCan's ZEVIP programme funds charger deployment and asks for siting analysis.
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.