Engineers Clinic
IntermediateEngineering trackAE-CP-30

High-Rise HVAC Load & Chilled-Water Optimisation

Internship role: MEP Engineering Intern. Calculate cooling loads for a high-rise floor plate, size chilled-water equipment and estimate savings from a higher supply temperature and variable-speed pumps.

10 Guided Steps120h Internship TierSubmit: GitHub repo or evidence pack + live demo / report + README + milestone logbookVerified CertificateAI Rubric Graded
Program Overview

Internship role: MEP Engineering Intern. Calculate cooling loads for a high-rise floor plate, size chilled-water equipment and estimate savings from a higher supply temperature and variable-speed pumps.

What you submit

GitHub repo or evidence pack + live demo / report + README + milestone logbook

Stack: Excel, ASHRAE data for Dubai climate, Python

How it is graded

Signals: Milestone gates met; measurable result reported; documentation; deployment or evidence reachable; reflective log

  • Functionality & requirements30
  • Technical quality & architecture25
  • Documentation15
  • Deployment & evidence15
  • Innovation10
  • Presentation5

Pass 60% · Merit 75% · Distinction 90%

Learning Outcomes
120-hour United Arab Emirates programme. Cooling is up to 70% of UAE building electricity; district cooling firms and MEP consultancies hire for this.
Target Audience

Engineering Students

Diploma, B.Tech, B.E., BCA, MCA, or M.Tech students seeking practical experience.

Aspiring Developers

Developers who want to build proof-of-work capstone projects for tech resumes.

Job Seekers

Graduates looking for AI-evaluated code review & verified industry credentials.